Google Classroom - Interaktiva lektioner
GeoGebraGeoGebra Classroom - Interaktiva lektioner

Average cost and marginal cost plotted on own axis

Aedifico Ltd is a small construction firm. The total cost (TC, in £) and marginal cost (MC) of Aedifico's concrete depends on tons produced (Q) as follows: TC = Q³ - 9Q² + 40Q + 50 MC = 3Q² – 18Q + 40 Marginal cost and average cost (TC/Q) have been plotted here. To see their relationship with the total cost curve, see http://www.geogebratube.org/student/m13345